For
those of you reading this blog who are familiar with Colorado’s law as it
pertains to construction defect actions, which I assume to be anyone reading
this blog as it does not seem to get much random traffic, you are probably aware
that the statute of repose applicable to construction defect actions in
Colorado is generally thought of as being six plus two years. Specifically,
C.R.S. § 13-80-104 states, in pertinent part:
(1)(a) Notwithstanding any statutory provision to
the contrary, all actions against any architect, contractor, builder or builder
vendor, engineer, or inspector performing or furnishing the design, planning,
supervision, inspection, construction, or observation of construction of any
improvement to real property shall be brought within the time provided in section 13-80-102 after the claim for relief arises, and not thereafter,
but in no case shall such an action be brought more than six years after the
substantial completion of the improvement to the real property, except as
provided in subsection (2) of this section.
* * *
(2)
In case any such cause of action arises during the fifth or sixth year after substantial
completion of the improvement to real property, said action shall be brought
within two years after the date upon which said cause of action arises.
Senate Bill
15-091, introduced on January 14th and assigned to the
State, Veterans, and Military Affairs Committee, would change these provisions
to read:
(1)(a) Notwithstanding any statutory
provision to the contrary, all actions against any architect, contractor,
builder or builder vendor, engineer, or inspector performing or furnishing the
design, planning, supervision, inspection, construction, or observation of
construction of any improvement to real property shall be brought within the
time provided in section 13-80-102 after the claim for relief arises, and not
thereafter, but in no case shall such an action be brought more than six
THREE
years
after the substantial completion of the improvement to the real property,
except as provided in subsection (2) of this section.
* * *
(2) In case any such IF A cause of action SUBJECT TO THIS
SECTION arises
during the fifth SECOND
or sixth
THIRD
year
after substantial completion of the improvement to real property, said THE action shall
MUST
be
brought within two years ONE YEAR after the date upon which said
THE
cause
of action arises.
While
I have not seen yet the reaction to this bill from the construction defect
plaintiffs’ attorneys, other than Heidi Storz’s quotes in the recent Denver
Business Journal article
by Ed Sealover, I imagine that it will receive a strong and determined
opposition. I assume that one of the arguments we will hear will refer to a
paper published years ago by the Colorado Association of Geotechnical Engineers,
according to which, damage to homes suffering from the effects of expansive
soils typically manifests somewhere between the fourth and seventh years after
substantial completion. The argument I assume to be coming will be that
builders are trying to insulate themselves from these types of cases by cutting
off owners’ rights to seek redress before they even know they have problems.
We
will continue to watch the legislature for bills impacting construction law in
Colorado and will monitor the progress of such bills, including Senate Bill 91.
I am not sure how far this bill will make it, but I hope that it does not cause
too much distraction or confusion of issues if and when Senator Ulibarri
introduces his attainable housing bill, thought to be coming soon and to be
similar to last year’s effort, Senate Bill
14-220.
If
you have any questions regarding construction law or
the litigation
of construction defect claims in Colorado,
you can reach David
M. McLain by e-mail at McLain@hhmrlaw.com or
by telephone at (303) 987-9813.